This is the only test site in Japan for the demonstration test on infrastructure inspection and disaster response by robot. It is possible to reproduce almost conceivable disaster environment and aging condition in structures such as tunnels, bridges, plants, urban areas and roads.

1Mockup bridge


It can be used for testing and operation training related to the condition check and inspection.
It reproduces the objects to be inspected such as cracking/peeling/flaking on concrete and looseness/cracking on steel bolts.
Also, objects of hindering on inspection, illumination posts, protective fences that may hinder inspection, trusses, or cable tubes can be installed.

Infrastructure inspection and disaster response robot facilities 1

1Mockup tunnel

5G base station
(Established by NTT DoCoMo, Inc. Scheduled to start service in September.)
Length 50m Road width 10m Bridge girder height 5m
Steel bridge part Steel simple girder length 35m
Concrete bridge part PC simple pretension system T girder bridge and the same floor slab bridge length 15m

Appendage

 

Mockup light column, flexible guard fence, rigid guard fence
Mockup trusses, mockup failure prevention devices, mockup inspection paths, mockup mounting pipes
Outdoor plug socket board

Inspection object

Cracking・Peeling・flaking of the concrete, loose bolt・crack of Steel material

Fee

Facility /
Equipment
Fee
AM
(9:00-13:00)
PM
(13:00-17:00)
Nighttime
(17:00-21:00)
Extratime
(per hour)
(0:00-9:00,
21:00-24:00)
Mockup bridge
29,700JPY 29,700JPY 35,600JPY 9,700JPY

2Mockup tunnel


maneuvering on situation confirmation, search, debris removal, aging inspections. On its wall, it is equipped with lighting equipment on expressways and ordinary roads (LED light, sodium lamp) and jet fans to reproduce cracking/peeling to be inspected. Inside the tunnel, obstacles such as vehicle, rubble, rock, or gravel can be placed, and the shutters on both sides can be closed to reproduce the central part of a long tunnel.

Infrastructure inspection and disaster response robot facilities 2

2Mockup tunnel

Length of 50m(Barbed concrete section 40m,Plain concrete section 10m),road width of 6m
Inner section W8.8m×H6.36m

Appendage

LED light, sodium lamp
Mockup jet fan
Mockup fire-hydrant
Water supply port
Induction display board
Water drain
Plug socket board

Inspection object

Cracking of the concrete
Flaking
Deficiency of thickness of tunnel wall

Fee

Facility / Equipment Fee
AM
(9:00-13:00)
PM
(13:00-17:00)
Nighttime
(17:00-21:00)
Extratime
(per hour)
(0:00-9:00,
21:00-24:00)
Mockup tunnel
26,400JPY 26,400JPY 31,700JPY 8,600JPY

3Mockup plant


This facility reproduces plants at normal/disaster situation to perform tests and maneuvering training on inspections, information gathering and equipment operation. This facility has been installed plumbs, valves, ducts, stairs, spiral stairs, catwalks, vertical ladders, tanks and chimneys in various shapes. Abnormal environments can be reproduced, by changing/blinking instruments and indicators, filling smoke or gas, and arranging heat sources and debris.

Infrastructure inspection and disaster response robot facilities 3

Fee

Facility / Equipment Fee
AM
(9:00-13:00)
PM
(13:00-17:00)
Nighttime
(17:00-21:00)
Extratime
(per hour)
(0:00-9:00,
21:00-24:00)
Mockup plant, 1F (when using half space)
14,100JPY 14,100JPY 16,900JPY 4,600JPY
Mockup plant, 2F
13,900JPY 13,900JPY 16,700JPY 4,600JPY
Mockup plant, 3F
10,900JPY 10,900JPY 13,100JPY 3,600JPY
Mockup plant, 4F
10,200JPY 10,200JPY 12,300JPY 3,400JPY
Mockup plant, 5F / 6F
16,800JPY 16,800JPY 20,200JPY 5,500JPY
  • Infrastructure inspection and disaster response robot facilities 4
  • Infrastructure inspection and disaster response robot facilities 5
  • Infrastructure inspection and disaster response robot facilities 6
  • Infrastructure inspection and disaster response robot facilities 7
  • Infrastructure inspection and disaster response robot facilities 8
  • Infrastructure inspection and disaster response robot facilities 9

3Mockup plant

5G base station
(Established by NTT DoCoMo, Inc.
Scheduled to start service in September.)
Steel construction 6 stories(height 30m)
Each floor approx.130 ㎡
Elevator for cargo
(H2.0m×W4.5m weight upper limit 2.1t)
5th and 6th floor

3 chimneys(ф3m, ф2m, ф1m) and vertical ladder are installed.The 5th and 6th floor total space 197.08 ㎡

3rd and 4th floor

Mockup tank (3rd floor r 2.8m, 4th floor r 1.8m)
and vertical ladders and spiral stairs are installed.
3rd and 4th floor each space127.82 ㎡

2nd floor

Piping (SGP500A,300A,200A,100A,50A,PVC200A,50A)GateValve,
pressure gauge, View station, duct

1st floor (2 sections)

Piping (SGP200A,150A, 100A,80A,50A)

AMock up boiler

BPump

CTank

Slope, ball valve, gate valve, butterfly valve, pressure gauge, water level gauge

4Urban field


In this field, houses, buildings and intersections with traffic light/road sign are arranged to reproduce the condition of city area. Vehicles, debris, and objects to be inspected are placed inside/outside the buildings to perform information gathering, investigation, obstacle removal, search and rescue of personnel, and inspection testing and maneuvering training. It can also be used for running tests using concrete and wood debris, bleaching training on building walls and floors, and automatic driving tests using road parts

Infrastructure inspection and disaster response robot facilities 10

4Urban field

5G base station
(Established by NTT DoCoMo, Inc.
Scheduled to start service in September.)
Building A Reinforced concrete construction,
3 stories, each floor 100㎡
House A Wooden construction, 2 stories,
each floor space 53㎡
(Simulate the inside house and simulate damage)
House B Wooden construction, 2 stories,
each floor 53 ㎡
(simulates the inside house)
Garage 1
(building type)
Steel construction, 1 story,
110㎡ Inside can be used as a warehouse
Garage 2
(Housing type)
Steel construction, 1 story,
56㎡ inside can be used as a warehouse
Garage 3
(Housing type)
Steel construction, 1 story,
56㎡ inside can be used as a warehouse
Garage 4 Light gauge steel construction, 1 story,
47 ㎡ Inside can be used as a warehouse

Road

North-south direction Length 75m Width 12m
(including sidewalks)
East-west direction Length 96m, width 7.5m
(including the sidewalk)
Telegraph poles, road signs, lights, traffic lights, etc.

Debris

Concrete culvert (32 Pieces)
Bleaching panel (9 pieces)
Concrete Debris

Fee

Facility / Equipment Fee
AM
(9:00-13:00)
PM
(13:00-17:00)
Nighttime
(17:00-21:00)
Extratime
(per hour)
(0:00-9:00,
21:00-24:00)
Urban field
(Building A , House A-B , Road,Debris)
30,500JPY 30,500JPY 36,500JPY 9,900JPY
Urban field (Building A)
9,500JPY 9,500JPY 11,400JPY 3,100JPY
Urban field (House A)
5,800JPY 5,800JPY 7,000JPY 1,900JPY
Urban field (House B)
6,000JPY 6,000JPY 7,200JPY 2,000JPY
Urban field (Road)
15,800JPY 15,800JPY 18,900JPY 5,200JPY
Urban field (Debris)
3,500JPY 3,500JPY 4,200JPY 1,200JPY
Facility / Equipment Fee
Per month All day
Urban field Garage 1 (Building type)
224,700JPY 9,900JPY
Urban field Garage 2 (Housing type)
160,800JPY 7,800JPY
Urban field Garage 3 (Housing type)
142,700JPY 7,200JPY
Urban field Garage 4
99,200JPY 5,700JPY

5Debris/landslide field


This facility reproduces the road interception site at the time of disaster and the landslide site. It can be used for testing and operation training on unmanned construction heavy equipment and robot status confirmation, search and rescue, and restoration work. It has a soil slope reproducible at 15 or 30 degree, muddy grounds with adjustable softness, and a circuit for running durability test, as well as various obstacles that can be placed on the road.

Infrastructure inspection and disaster response robot facilities 11

Circuit

Length 400m, width 4m, (asphalt pavement)

Muddy ground

30m×30m depth 0.3m

Soil slope

Inclination 30° 30m×30m, height approx. 7m
Inclination 15° 30m×30m, height approx. 3m

Cracks/ Sinks

Length 20m , width 7.6m, (asphalt pavement)
Road collapse/Road crack

Debris

Length 20m, width 6m, (asphalt pavement)
Concrete block/ Vehicles

Gravel/ Fallen trees

Length 30m, width 6m, (concrete pavement)
Soil, rock, approx.10 fallen trees

Fee

Facility / Equipment Fee
AM
(9:00-13:00)
PM
(13:00-17:00)
Nighttime
(17:00-21:00)
Extratime
(per hour)
(0:00-9:00,
21:00-24:00)
Debris / landslide field
(Gravel / fallen trees , Debris , Crocks / Sinks ,
Soil slope , muddy ground,Circuit)
21,000JPY 21,000JPY 25,100JPY 6,800JPY
Debris / landslide field (Gravel / fallen trees)
3,600JPY 3,600JPY 4,300JPY 1,200JPY
Debris / landslide field (Debris)
3,000JPY 3,000JPY 3,600JPY 1,000JPY
Debris / landslide field (Crocks / Sinks)
3,900JPY 3,900JPY 4,700JPY 1,300JPY
Debris / landslide field (Soil slope)
13,900JPY 13,900JPY 16,700JPY 4,600JPY
Debris / landslide field (muddy ground)
3,700JPY 3,700JPY 4,400JPY 1,200JPY
Debris / landslide field (Circuit)
5,100JPY 5,100JPY 6,200JPY 1,700JPY

Remarks

(1) A.M.: 9:00 a.m. to 1:00 p.m., P.M.: 1:00 p.m. to 5:00 p.m., Nighttime: 5:00 p.m. to 9:00 p.m., All day: 12:00 a.m. to 12:00 a.m., Extratime : 1 hour during 12:00 a.m. to 9:00 a.m. and 9:00 p.m. to 12:00 a.m.

(2) The same amount as fee is added when it falls under any of the following.
1. When holding an event by collecting admission fee, attendance fee, or membership fee for a prot. 2. When using for any prot-making activities, such as selling goods,commercial advertisement, etc.

(3) Fee is reduced to 70%, when using for preparation.