1Mockup bridge
It can be used for testing and operation training related to the condition check and inspection.
It reproduces the objects to be inspected such as cracking/peeling/flaking on concrete and looseness/cracking on steel bolts.
Also, objects of hindering on inspection, illumination posts, protective fences that may hinder inspection, trusses, or cable tubes can be installed.
1Mockup tunnel
5G base station (Established by NTT DoCoMo, Inc. Scheduled to start service in September.) |
|
Length 50m Road width 10m Bridge girder height 5m | |
Steel bridge part | Steel simple girder length 35m |
---|---|
Concrete bridge part | PC simple pretension system T girder bridge and the same floor slab bridge length 15m |
Appendage
Mockup light column, flexible guard fence, rigid guard fence Mockup trusses, mockup failure prevention devices, mockup inspection paths, mockup mounting pipes Outdoor plug socket board |
Inspection object
Cracking・Peeling・flaking of the concrete, loose bolt・crack of Steel material |
Fee
Facility / Equipment |
Fee | |||
---|---|---|---|---|
AM (9:00-13:00) |
PM (13:00-17:00) |
Nighttime (17:00-21:00) |
Extratime (per hour) (0:00-9:00, 21:00-24:00) |
|
Mockup bridge
|
29,700JPY | 29,700JPY | 35,600JPY | 9,700JPY |
2Mockup tunnel
maneuvering on situation confirmation, search, debris removal, aging inspections. On its wall, it is equipped with lighting equipment on expressways and ordinary roads (LED light, sodium lamp) and jet fans to reproduce cracking/peeling to be inspected. Inside the tunnel, obstacles such as vehicle, rubble, rock, or gravel can be placed, and the shutters on both sides can be closed to reproduce the central part of a long tunnel.
2Mockup tunnel
Length of 50m(Barbed concrete section 40m,Plain concrete section 10m),road width of 6m | |
Inner section | W8.8m×H6.36m |
---|
Appendage
LED light, sodium lamp Mockup jet fan Mockup fire-hydrant Water supply port Induction display board Water drain Plug socket board |
Inspection object
Cracking of the concrete Flaking Deficiency of thickness of tunnel wall |
Fee
Facility / Equipment | Fee | |||
---|---|---|---|---|
AM (9:00-13:00) |
PM (13:00-17:00) |
Nighttime (17:00-21:00) |
Extratime (per hour) (0:00-9:00, 21:00-24:00) |
|
Mockup tunnel
|
26,400JPY | 26,400JPY | 31,700JPY | 8,600JPY |
3Mockup plant
This facility reproduces plants at normal/disaster situation to perform tests and maneuvering training on inspections, information gathering and equipment operation. This facility has been installed plumbs, valves, ducts, stairs, spiral stairs, catwalks, vertical ladders, tanks and chimneys in various shapes. Abnormal environments can be reproduced, by changing/blinking instruments and indicators, filling smoke or gas, and arranging heat sources and debris.
Fee
Facility / Equipment | Fee | |||
---|---|---|---|---|
AM (9:00-13:00) |
PM (13:00-17:00) |
Nighttime (17:00-21:00) |
Extratime (per hour) (0:00-9:00, 21:00-24:00) |
|
Mockup plant, 1F (when using half space)
|
14,100JPY | 14,100JPY | 16,900JPY | 4,600JPY |
Mockup plant, 2F
|
13,900JPY | 13,900JPY | 16,700JPY | 4,600JPY |
Mockup plant, 3F
|
10,900JPY | 10,900JPY | 13,100JPY | 3,600JPY |
Mockup plant, 4F
|
10,200JPY | 10,200JPY | 12,300JPY | 3,400JPY |
Mockup plant, 5F / 6F
|
16,800JPY | 16,800JPY | 20,200JPY | 5,500JPY |
3Mockup plant
5G base station (Established by NTT DoCoMo, Inc. Scheduled to start service in September.) |
Steel construction 6 stories(height 30m) Each floor approx.130 ㎡ Elevator for cargo (H2.0m×W4.5m weight upper limit 2.1t) |
5th and 6th floor3 chimneys(ф3m, ф2m, ф1m) and vertical ladder are installed.The 5th and 6th floor total space 197.08 ㎡ |
3rd and 4th floorMockup tank (3rd floor r 2.8m, 4th floor r 1.8m) |
2nd floorPiping (SGP500A,300A,200A,100A,50A,PVC200A,50A)GateValve, |
1st floor (2 sections)Piping (SGP200A,150A, 100A,80A,50A) AMock up boiler BPump CTank Slope, ball valve, gate valve, butterfly valve, pressure gauge, water level gauge |
4Urban field
In this field, houses, buildings and intersections with traffic light/road sign are arranged to reproduce the condition of city area. Vehicles, debris, and objects to be inspected are placed inside/outside the buildings to perform information gathering, investigation, obstacle removal, search and rescue of personnel, and inspection testing and maneuvering training. It can also be used for running tests using concrete and wood debris, bleaching training on building walls and floors, and automatic driving tests using road parts
4Urban field
5G base station (Established by NTT DoCoMo, Inc. Scheduled to start service in September.) |
|
---|---|
Building A | Reinforced concrete construction, 3 stories, each floor 100㎡ |
House A | Wooden construction, 2 stories, each floor space 53㎡ (Simulate the inside house and simulate damage) |
House B | Wooden construction, 2 stories, each floor 53 ㎡ (simulates the inside house) |
Garage 1 (building type) |
Steel construction, 1 story, 110㎡ Inside can be used as a warehouse |
Garage 2 (Housing type) |
Steel construction, 1 story, 56㎡ inside can be used as a warehouse |
Garage 3 (Housing type) |
Steel construction, 1 story, 56㎡ inside can be used as a warehouse |
Garage 4 | Light gauge steel construction, 1 story, 47 ㎡ Inside can be used as a warehouse |
Road
North-south direction | Length 75m Width 12m (including sidewalks) |
---|---|
East-west direction | Length 96m, width 7.5m (including the sidewalk) |
Telegraph poles, road signs, lights, traffic lights, etc. |
Debris
Concrete culvert (32 Pieces) Bleaching panel (9 pieces) Concrete Debris |
Fee
Facility / Equipment | Fee | |||
---|---|---|---|---|
AM (9:00-13:00) |
PM (13:00-17:00) |
Nighttime (17:00-21:00) |
Extratime (per hour) (0:00-9:00, 21:00-24:00) |
|
Urban field
(Building A , House A-B , Road,Debris) |
30,500JPY | 30,500JPY | 36,500JPY | 9,900JPY |
Urban field (Building A)
|
9,500JPY | 9,500JPY | 11,400JPY | 3,100JPY |
Urban field (House A)
|
5,800JPY | 5,800JPY | 7,000JPY | 1,900JPY |
Urban field (House B)
|
6,000JPY | 6,000JPY | 7,200JPY | 2,000JPY |
Urban field (Road)
|
15,800JPY | 15,800JPY | 18,900JPY | 5,200JPY |
Urban field (Debris)
|
3,500JPY | 3,500JPY | 4,200JPY | 1,200JPY |
Facility / Equipment | Fee | |
---|---|---|
Per month | All day | |
Urban field Garage 1 (Building type)
|
224,700JPY | 9,900JPY |
Urban field Garage 2 (Housing type)
|
160,800JPY | 7,800JPY |
Urban field Garage 3 (Housing type)
|
142,700JPY | 7,200JPY |
Urban field Garage 4
|
99,200JPY | 5,700JPY |
5Debris/landslide field
This facility reproduces the road interception site at the time of disaster and the landslide site. It can be used for testing and operation training on unmanned construction heavy equipment and robot status confirmation, search and rescue, and restoration work. It has a soil slope reproducible at 15 or 30 degree, muddy grounds with adjustable softness, and a circuit for running durability test, as well as various obstacles that can be placed on the road.
Circuit
Length 400m, width 4m, (asphalt pavement) |
Muddy ground
30m×30m depth 0.3m |
Soil slope
Inclination 30° | 30m×30m, height approx. 7m |
---|---|
Inclination 15° | 30m×30m, height approx. 3m |
Cracks/ Sinks
Length 20m , width 7.6m, (asphalt pavement) Road collapse/Road crack |
Debris
Length 20m, width 6m, (asphalt pavement) Concrete block/ Vehicles |
Gravel/ Fallen trees
Length 30m, width 6m, (concrete pavement) Soil, rock, approx.10 fallen trees |
Fee
Facility / Equipment | Fee | |||
---|---|---|---|---|
AM (9:00-13:00) |
PM (13:00-17:00) |
Nighttime (17:00-21:00) |
Extratime (per hour) (0:00-9:00, 21:00-24:00) |
|
Debris / landslide field
(Gravel / fallen trees , Debris , Crocks / Sinks , Soil slope , muddy ground,Circuit) |
21,000JPY | 21,000JPY | 25,100JPY | 6,800JPY |
Debris / landslide field (Gravel / fallen trees)
|
3,600JPY | 3,600JPY | 4,300JPY | 1,200JPY |
Debris / landslide field (Debris)
|
3,000JPY | 3,000JPY | 3,600JPY | 1,000JPY |
Debris / landslide field (Crocks / Sinks)
|
3,900JPY | 3,900JPY | 4,700JPY | 1,300JPY |
Debris / landslide field (Soil slope)
|
13,900JPY | 13,900JPY | 16,700JPY | 4,600JPY |
Debris / landslide field (muddy ground)
|
3,700JPY | 3,700JPY | 4,400JPY | 1,200JPY |
Debris / landslide field (Circuit)
|
5,100JPY | 5,100JPY | 6,200JPY | 1,700JPY |
Remarks
(1) A.M.: 9:00 a.m. to 1:00 p.m., P.M.: 1:00 p.m. to 5:00 p.m., Nighttime: 5:00 p.m. to 9:00 p.m., All day: 12:00 a.m. to 12:00 a.m., Extratime : 1 hour during 12:00 a.m. to 9:00 a.m. and 9:00 p.m. to 12:00 a.m.
(2) The same amount as fee is added when it falls under any of the following.
1. When holding an event by collecting admission fee, attendance fee, or membership fee for a prot. 2. When using for any prot-making activities, such as selling goods,commercial advertisement, etc.
(3) Fee is reduced to 70%, when using for preparation.
(4) When using continuously for two days or more, fee is not occured from the night to early morning, as far as it is used for storage of display items and equipment.